Topics > County Durham > Seaham > Vane Tempest Colliery (1926-1993)
Vane Tempest Colliery (1926-1993)

from Newcastle University (youtube)
NEW PITHEAD BATHS OPENED (aka SEAHAM HARBOUR)
Pinned by Simon Cotterill

from http://www.dmm.org.uk/colleng…
The Boring Work Preliminary to Shaft Sinking by the Freezing Process is described in connection with a New Undertaking of Londonderry Collieries Limited.
- Colliery Engineering, June 1925. A DURHAM SINKING "....Two shafts having centres 66 2/3 yards apart are to be sunk each having a finished diameter of 21 ft. A preliminary borehole …
Added by
Simon Cotterill


from Newcastle University (youtube)
NEW PITHEAD BATHS OPENED (aka SEAHAM HARBOUR)
Pinned by Simon Cotterill

from http://www.dmm.org.uk/colleng…
The Boring Work Preliminary to Shaft Sinking by the Freezing Process is described in connection with a New Undertaking of Londonderry Collieries Limited.
- Colliery Engineering, June 1925. A DURHAM SINKING "....Two shafts having centres 66 2/3 yards apart are to be sunk each having a finished diameter of 21 ft. A preliminary borehole …
Added by
Simon Cotterill
Grid ref:
NZ425503