Topics > Transport and Travel > Railway > Cockermouth, Keswick and Penrith Railway

Cockermouth, Keswick and Penrith Railway


  • Officially opened for goods traffic on the 1st of November 1864
  • Officially opened for passenger traffic on the 2nd of January 1865

The Cockermouth, Keswick and Penrith Railway (CK&PR) was an English railway company incorporated by Act of Parliament on 1 August 1861, to build a line connecting the town of Cockermouth with the London and North Western Railway (LNWR) West Coast Main Line at Penrith. Arrangements for the use of the stations at either end (Cockermouth was already served by the Cockermouth and Workington Railway (C&WR)) were included. Passenger and goods traffic was worked by the LNWR and mineral traffic by the North Eastern Railway, both of whom had shares in the company (the NER inheriting its holding from the Stockton and Darlington Railway, which had encouraged the promotion of the line). The line was in length, and had eight intermediate stations.

Railway stations

From west to east:

  • Cockermouth: a joint station with the Cockermouth and Workington Railway, whose original station became the joint goods station.
  • Embleton (initially 'Lambfoot' in local property advertisements)
  • Bassenthwaite Lake (initially 'Peel Wyke' in local property advertisements): the line skirted the lake for a considerable distance
  • Braithwaite
  • Keswick
  • Threlkeld
  • Troutbeck
  • Penruddock
  • Blencow
  • Penrith

History

Background

The company had its immediate origins in a meeting at Keswick in September 1860 which agreed to promote a railway linking Keswick to existing railways at Cockermouth (to the West) and Penrith (to the East). A project for a railway linking the towns had been promoted during the Railway Mania, getting as far as a survey of the proposed route, but nothing had come of this (nor of a projected railway from Cockermouth to Windermere via Keswick). Consequently, a Keswick resident complained in 1857, "Here we are buried - shut out from the world, as it were - 15 hours from a morning paper while other people know at an instant what happens at the other end of the kingdom" However, the prospectus for the company argued, what would make the line profitable was not local traffic to Keswick, but potential two-way mineral traffic between the haematite orefield of West Cumberland and the coke-ovens of South Durham.

The project was supported by the London and North Western Railway (whose line would be joined at Penrith), and by the Stockton and Darlington Railway which had been behind a series of lines engineered by Thomas Bouch which together gave access from South Durham to the West Coast Main Line at Clifton just south of Penrith. The Cockermouth and Workington Railway, with which the CK&PR was to link at its western end, initially intended to support the CK&PR directly, but was not in a financial position to do so; instead many of the C&W directors took substantial shareholdings in the new line, with some sitting on its board. The company's Bill was unopposed, and its Act received its Royal Assent in August 1861.

 

Construction and opening

Work on the line began May 1862, the first sod being cut at Great Crosthwaite by the company chairman. The directors were able to make inspection trips to Keswick from either end of the line in May–June 1864; on their trip from Cockermouth they were accompanied by goods waggons, thereafter Keswick was "supplied with coal by rail from the Workington pits" (implying that the Cockermouth-Keswick section of the line was de facto open for mineral traffic). The line was officially opened for goods traffic on 1 November 1864; mineral traffic may have been running over it from 26 October 1864.

On 29 September 1864 passenger trains had been run from either end of the line to Keswick for an agricultural show there 'though the line is not yet officially open, owing to the punctilios of a certain government official' (free tickets were issued by the contractor for the line and the Cockermouth and Workington Railway lent carriages and staff). The Penrith-Keswick mail coach had ceased to run in mid-November 'being knocked off the road by ... the Railway Engine', but the railway was not officially opened for passenger traffic until 2 January 1865. Trains ran to and from a new joint station at Cockermouth. At first they merely connected there with the C&WR service to Workington, but by April passenger trains were timetabled to work through from Penrith to Whitehaven along the CK&PR/C&WR route.

The CK&PR had agreed with its sponsoring railways that the LNWR was to work passenger and goods traffic on the line (receiving one-third of earnings) whilst the S&D was to work mineral traffic (the S&D to receive 35% of earnings, and the CK&PR to pay for waggons). The CK&PR also provided non-moving staff. The line was laid out by Bouch with the object of the utmost economy; although the bridges were permanent (stone and iron rather than timber trestles). The CK&PR joined the West Coast Main Line by a north-facing junction at Penrith; trains to or from the south would have had to go to Penrith and reverse direction, had the NER not built a 'loop line' (at Red Hills, south of Penrith) giving a south to west junction. The line was single throughout; when the LNWR recommended instead that the line be built from the start as double-track, the CK&PR board rejected this advice, preferring to delay doubling until actual receipts justified it. Furthermore, according to a pseudonymous contemporary critic, the engineering of the line, and the purchase of land made no provision for future doubling: consequently the line was "really a miserable affair, anything but a first-class line as it was originally boasted to be. Everything connected with it has been sacrificed to cheapness, which in this undertaking, as everyone must see, has been unquestionably carried too far. The line is single, the bridges are single; everything appertaining or belonging to it is single, and, strange to say, land has been taken up for a single line only."

With the adoption of 'absolute block' working in 1892 (at the insistence of the Board of Trade), the section between Thelkeld and Troutbeck had to be converted into two blocks (by the addition of a signal box just to the west of the Mosedale Viaduct) to prevent excessive delays . The line was eventually doubled over the heavy gradients between Threkeld and Red Hills: doubling between Threkeld and Troutbeck (west of the summit) was in effect by 1896; extension of this to Penruddock was undertaken in 1900, along with doubling east of the summit (Red Hills to Blencow) and was not completed until spring 1901.

It had been predicted that the mineral traffic over the line would (on its own) ensure dividends of at least 5% as soon as the line opened, but this proved to have been optimistic. The line cost more to build than anticipated, and the mineral traffic was not as large as predicted. The profitability was also low; through rates were effectively governed by those set by the Maryport and Carlisle Railway. These were deliberately set by the M&C at levels (as low as 0.625 d/mile) which should have deterred the construction of competing lines. Unlike the M&CR, the CP&KR had severe gradients (west-bound a climb of 1 in 70 between Penrith and Blencow, east-bound 1 in 62½ between Threkeld and Troutbeck) and therefore higher running costs; a CK&PR chairman claimed that a locomotive could haul on the M&CR a train three times as heavy as it could haul over the CK&PR. Nor did the CK&PR have the lucrative local colliery traffic of the M&CR. Passenger and goods traffic on the line were, however, sufficient to make the CK&PR profitable; eventually passenger traffic became the main revenue as mineral traffic declined further. Technological improvements in steelmaking reduced the dependence of the British steel industry on Cumbrian haematite. Blast furnaces were established close to the orefield, and processed much of the ore locally. Although, initially, they needed to import coke to do so, later improvements in coke-making allowed them to increasingly use coke made from local coal; considerable volumes of Welsh coke also began to reach West Cumbria by sea. Increased foreign production of iron and steel meant a loss of foreign markets and over-capacity in the British iron and steel industry.

Tourist traffic was a vital contributor to passenger revenue. In 1863, a shareholders' meeting authorised the expenditure of £11,000 on the construction of a first-class railway hotel; such a hotel, the directors had urged, was essential if Keswick was to compete with the Scottish lochs and Switzerland. By 1865, when the hotel had been built, it was evident that the capital cost of the railway had overrun to an alarming extent; the LNWR advised strongly (and the NER concurred) that railway hotels were not profitable when run by railway companies; furthermore it was now thought that the hotel needed to be extended before anyone could run it profitably. The hotel was therefore sold to a separate company, floated for the purpose, with a considerably overlapping directorate, and with railway shareholders being given first refusal on the hotel company shares. Keswick also attracted day trips (works outings, Sunday school treats) from Carlisle and industrial West Cumberland, and was a popular venue for Temperance demonstrations, although much depended on the weather:Soon after the departure from Carlisle the rain commenced to fall in heavy showers, and continued throughout the whole of the day without the slightest perceptible abatement. Between eleven and twelve o'clock the whole of the excursion trains had arrived, and the streets of Keswick were literally crowded by an immense concourse of people, whose wet and weary appearance indicated the entire absence of enjoyment. It was impossible to look upon the drifting multitude without feelings of compassion. Those local places of interest which have given to Keswick an attractive reputation were unvisited, and the people seemed to wander from the tea rooms to the public-houses during the whole day … If the weather had been propitious, the Demonstration would have proved a marked success, for seldom has such a large number of people accompanied an excursion to Keswick. As the excursionists returned to the station towards evening, a more reliable estimate could be formed of the number present, which was represented by several thousands. Beyond a few expressions of sympathy with some loitering excursionists who missed the homeward train, nothing transpired in the shape of an accident to call forth regret save the serious weather, which reminded many of the not altogether groundless proverb that, "it always rains at Keswick"

In return for subscribing for £25,000 of CK&PR shares, the LNWR had been granted running rights over the CK&PR in perpetuity. Although in the LNWR 'jumped over the head of' the CK&PR to absorb the Cockermouth and Workington Railway, and the Whitehaven Junction Railway in 1866 (almost as soon as they had been connected to the LNWR by the CK&PR), it made no similar offer for the CK&PR until 1890 when it offered to lease the CK&PR for 5%. The CK&PR's dividend had averaged 5% over the last four years, and its board held out for 6%, which the LNWR refused to offer. The LNWR also rebuffed subsequent attempts by the CK&PR to reopen negotiations, and the latter continued to operate as a separate company until the 1923 Grouping, when it was absorbed by the London, Midland and Scottish Railway.

Closure

The line was closed west of Keswick in April 1966. The Keswick to Penrith section followed suit in March 1972, though freight trains continued to run to Flusco and Blencow, at the eastern end of the line, until the following June.

Keswick Museum and Art Gallery displays many items connected with the railway, including the barrow and spade used in the ceremony to cut the first sod for the railway on 21 May 1862, train tickets from the 19th century, and a platform guard's whistle.

The development of the A66 road used much of the former track path from Cockermouth to beyond Bassenthwaite Lake. Much of the section between Keswick and Penrith, through the National Park, has been made into a cycle and walking route, and is maintained as such by the park authority.

The future

There is a proposal to reopen the line as a modern railway and a feasibility study has been commissioned by CKP Railways plc to examine the business case. However, Eden District Council appears to be against the reopening plan and are allowing development at Flusco Business Park to straddle the trackbed. A proposal to demolish the Mosedale Viaduct was cancelled by the British Rail Property Board in 1997 because of the plan to reinstate the line.

The project to reopen the railway has been dealt some serious blows, including numerous trackbed breaches, lack of funding and the NWRDA saying the case was not strong enough compared to other much more urgent projects. During floods in 2015, three bridges were damaged or destroyed. This makes it even more unlikely that the railway will be opened once more.

Text from Wikipedia, available under the Creative Commons Attribution-ShareAlike License (accessed: 28/01/2019).
Visit the page: Cockermouth, Keswick and Penrith Railway for references and further details. You can contribute to this article on Wikipedia.
Railway Penruddock Station (1865 - 1972) Cockermouth Station (1865 - 1966) Keswick Cockermouth Bassenthwaite Lake Railway Station (1865 - 1966) 1864 Former Railway Station Mosedale Viaduct
from Geograph (geograph)
Bassenthwaite Lake Station, with Down train

Pinned by Simon Cotterill
Bassenthwaite Lake Railway Station (1865 - 1966)
  Co-Curate Page
Bassenthwaite Lake Railway Station (1865 - 1966)
- Bassenthwaite Lake railway station was situated on the Cockermouth, Keswick and Penrith Railway between Penrith and Cockermouth in Cumbria, England. The station served the village of Dubwath. The station opened …
from Flickr (flickr)
Beyond, Where The Trees Close In

Pinned by Simon Cotterill
from Geograph (geograph)
Footbridge under the Old Cockermouth, Keswick and Penrith Railway

Pinned by Simon Cotterill
Cockermouth
  Co-Curate Page
Cockermouth
- Overview About Cockermouth Map Street View Cockermouth is a market town in the Cumberland unitary authority area, in the ceremonial county of Cumbria, located about 23 miles south-west of Carlisle …
Keswick
  Co-Curate Page
Keswick
- Overview About Keswick Map Street View   Keswick is an English market town and civil parish, historically in Cumberland, and since 1974 in the Borough of Allerdale in Cumbria. The …
from Geograph (geograph)
Keswick station, with new DMU, 1956

Pinned by Simon Cotterill
from Geograph (geograph)
Greta bridges – Bridge 4

Pinned by Simon Cotterill
from Geograph (geograph)
Cockermouth, Keswick & Penrith Railway

Pinned by Simon Cotterill
from Geograph (geograph)
Greta bridges – Bridge 7

Pinned by Simon Cotterill
Penruddock Station (1865 - 1972)
  Co-Curate Page
Penruddock Station (1865 - 1972)
- The station at Penruddock, on the Cockermouth, Keswick & Penrith Railway, opened to passenger traffic on the 2nd of January 1865. The station closed on the 6th of March 1972.
from http://www.cumbria-railways.c…
The Cockermouth, Keswick & Penrith Railway
- "The construction of the Cockermouth, Keswick & Penrith Railway (CK&PR) was brought about by the need to transport iron ore and pig iron from West Cumberland to the north east …

Added by
Simon Cotterill
Cockermouth Station (1865 - 1966)
  Co-Curate Page
Cockermouth Station (1865 - 1966)
- The railway station in Cockermouth was opened to passengers on the 2nd of January 1865. It was opened jointly by the Cockermouth, Keswick & Penrith Railway and the Cockermouth & …

Comments

Add a comment or share a memory.

Login to add a comment. Sign-up if you don't already have an account.



ABOUT US

Co-Curate is a project which brings together online collections, museums, universities, schools and community groups to make and re-make stories and images from North East England and Cumbria. Co-Curate is a trans-disciplinary project that will open up 'official' museum and 'un-officia'l co-created community-based collections and archives through innovative collaborative approaches using social media and open archives/data.

LATEST SHARED RESOURCES